Project risk assessment for urban drainage monitoring system could increase the capacity to resist project risk and promote project popularization of wastewater on-line monitoring system. After the analysis of related risk impact factors, a risk assessment index system based on field surveys and expert questionnaire in Guangzhou is established by using grey evaluation method i.e. grey decision method and grey relational analysis method. Some conclusions have been drawn. They are as follows: There are a lot of risks in entire project life cycle of auto-monitoring system for urban wastewater. And the risk existing in construction phase is bigger than that in other phases. Among these risk indicators in the project life cycle, some indicators have relatively high weights, such as the feasibility demonstration, the reasonability for collecting water samples, the maintenance and expansion of equipments, the monitoring data quality, and the quality of employees, et al. If the more attention to is paid these indicators, the risks could be reduced.
Key words
auto-monitoring system /
project risk assessment /
grey evaluation /
wastewater on-line monitor
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
References
[1] 环境保护部科技标准司.水污染连续自动监测系统运营管理[M].北京:化学工业出版社,2008:65.
[2] Haan C T. Statistical Methods in Hydrology[M]. Ames:The Iowa State Press, 2002.
[3] Harmel R D, et al.Estimating storm discharge and water quality data uncertainty: A software tool for monitoring and modeling applications[J].Environmental Modelling & Software, 2009,24(7):832-842.
[4] National water quality monitoring council.water quality data elements:a user guide . NWQMC Technical Report No. 3,2006.4.
[5] Coquery M, et al.Priority substances of the European Water Framework Directive: analytical challenges in monitoring water quality[J].TrAC Trends in Analytical Chemistry, 2005,24(2):117-127.
[6] Hart B T, McKelvie I D, Benson R L. Real-time instrumentation for monitoring water quality: An Australian perspective[J].TrAC Trends in Analytical Chemistry,1993,12(10):403-412.
[7] Karamouz M, et al.Design of on-line river water quality monitoring systems using the entropy theory: a case study[J]. Environmental Monitoring and Assessment,155:63-81.
[8] Hargesheimer E E. Online monitoring for drinking water utilities[M]. Denver:American Water Works Association,2002.
[9] 孙海林.水污染源在线监测系统的运营管理[J]. 中国环境产业,2008(11):51-54.
[10] 罗翠琴.水质自动监测系统的建设与管理[J].现代测量与实验室管理,2009(2):32-33.
[11] 孟庆强,林毅.西朗污水处理厂BOT项目的水质、水量在线监管经验[J].中国给水排水,2006(24):78-80.
[12] 喻义勇等.南京市总量减排监测体系建设的实践与思考[J].环境监测管理与技术,2009(2):4-7.
[13] Barki H,et al.TowardanAssessmentofSoftwareDevelopment Risk[J].Journal of Management Information Systems,1993,10(2):203-225.
[14] Project Management Institute.A Guide to the Project Management Body of Knowledge: (PMBOK Guide 4th ed.)[M]. Pennsylvania: Newtown Square,2008.
[15] (加)怀德曼著.项目管理词汇手册(第3版)[M].项目管理志愿者团队译.北京:清华大学出版社,2002:542.
[16] Baldry D.The evaluation of risk management in public sector capital projects[J].International Journal of Project Management ,1998,16(1):35-41.
[17] 张亚莉等.项目的全寿命周期风险管理的研究[J].科学管理研究,2004(2):27-30.
[18] 叶义成.系统综合评价技术及其应用[M].北京:冶金工业出版社,2006:174-180.
[19] 刘思峰等.灰色系统理论及其应用 (3版)[M].北京 : 科学出版社, 2004:50-60.