基于服务主导逻辑的PBC模式价值创新机理研究

戴勇

科研管理 ›› 2014, Vol. 35 ›› Issue (7) : 67-74.

PDF(1 KB)
PDF(1 KB)
科研管理 ›› 2014, Vol. 35 ›› Issue (7) : 67-74.
论文

基于服务主导逻辑的PBC模式价值创新机理研究

  • 戴勇
作者信息 +

Value innovation mechanism of PBC Model under service dominant logic

  • Dai Yong
Author information +
文章历史 +

摘要

作为新型的售后服务模式,PBC开始逐步流行并成为服务供应链的研究焦点,PBC的出现对于服务备件供应链的运营产生了新的影响。本文首先对PBC模式的创新特点进行研究,然后提出了PBC的创新体现了服务主导逻辑的管理思想,并基于服务主导逻辑的视角,从PBC的价值主张与价值传递方式两个方面分析了价值创造机理,即基于价值链流程耦合、网络协同、整体嵌入演变路径的故障恢复、可靠性、绩效产出的价值主张创新以及基于客户资源的一体化以及传递过程中信息、人员、物料交互的价值传递的过程创新,并以罗尔斯-罗伊斯公司为例进行了分析,以对国内的相关研究提供借鉴。

Abstract

Performance based contract (PBC), as a new after-sales model, has already had a far-reaching impact on service supply chain with its increasing popularity in the research of supply chain. This paper attempts to analyze the new modes of PBC in the view of service dominant logic including PBC value proposition and value delivery. It further discusses the creative mechanism of value proposition of recovery, reliability, and performance achieved through value chain coupling, network alignment, and embedding as well as the innovation of value delivery through integration of customers' resources and interaction of information, personnel and material during the process. Finally a case study of Rolls Royce is put forward in order to provide reference for domestic related research.

关键词

PBC / 服务主导逻辑 / 售后服务商业模式 / 价值创新机理 / 装备制造

Key words

PBC / service dominant logic / after-sales business model / value innovation mechanism / manufacturing equipment

引用本文

导出引用
戴勇. 基于服务主导逻辑的PBC模式价值创新机理研究[J]. 科研管理. 2014, 35(7): 67-74
Dai Yong. Value innovation mechanism of PBC Model under service dominant logic[J]. Science Research Management. 2014, 35(7): 67-74
中图分类号: F406.11   

参考文献

[1] Cohen,M.A.,N.Agrawal,V.Agrawal.Winning in the Aftermarket.Harvard Business Review[J].2006,84(5):129-138. [2] Defense Acquisition University.Performance Based Logistics:A Program Manager's Guide [M].Washington:Defense Acquisition University Press,2005:1-3. [3] Ng,I.C.L.,Nudurupati,S.Outcome-based service contracts in the defense industry:mitigating the challenges[J].Journal of Service Management,2010,21(5):656-674. [4] Kim,S.H.,Cohen,M.A.,Netessine,S.Contracting for Infrequent Restoration and Recovery of Mission-Critical Systems[J].Management Science,2010,56(9):1551-1567. [5] Jin tongdan,Wang P.Planning performance based contracts considering reliability and uncertain system usage[J].Journal of the Operational Research Society,2012,63(2):1467-1478. [6] ner,K.B.,Kiesmuller,G.P.,Houtum,G.J.Optimization of component reliability in the design phase of capital goods[J].European Journal of Operation research 2010,205(3):615-624. [7] Lay,G.,Schroeter,M.and Biege,S.,Service-based business concepts:a typology for business-to-business markets[J].European Management Journal,2009,27(6):442-455. [8] Hypko,P.,M.Tilebein and R.Gleich.Clarifying the concept of performance-based contracting in manufacturing industries[J].Journal of Service Management,2010,21(5),625-655. [9] Randall,W.S.,Pohlen,T.L.and Hanna,J.B.Evolving a theory of performance based logistics using insights from service dominant logic[J].Journal of Business Logistics,2010,31(2):35-62. [10] Cohen.Product Performance Based Business Models:A Service Based Perspective .Proceedings HICCS-45,2012. [11] Hypko,P..Benefits and uncertainties of performance-based contracting in manufacturing industries.An agency theory perspective[J].Journal of Service Management,2010,21(4):460-489. [12] Jin Tongdan,Tian Yu.Optimizing reliability and service parts logistics for a time-varying installed base[J].European Journal of Operational Research,2012,218(1):152-162. [13] Mirzahosseinian.H,R.Piplani.A study of repairable parts inventory system operating under performance-based contract[J].European Journal of Operational Research,2011,214(2):256-261. [14] Tukker,A.and Tischner,U.New business for old europe:product-service development,competitiveness and sustainability[M].2006,Sheffield,Greenleaf Publishing. [15] Pawar,K.S.,Beltagui,A.and Riedel.The PSO triangle:designing product,service and organisation to create value[J].International Journal of Operations & Production Management,2009,29(5):468-493. [16] Vargo,S.L.and Lusch,R.F.The four service marketing myths:remnants of the goods-based,marketing model[J].Journal of Service Research,2004,6(4):324-335. [17] Vargo,S.L.and Lusch,R.F.Service dominant logic:continuing the evolution[J].Journal of the Academy of Marketing Science,2008,36(1):1-10. [18] Smith,Laura A.,Ng,Irene C.L.and Maull,Roger.The three value proposition cycles of equipment-based service[J].Production Planning & Control,2012,23(7):553-570. [19] Guajardo,J.,Cohen M.A.,S.H.Kim,S.Netessine.Impact of performance-based contracting on product reliability:An empirical analysis[J].Management Science,2012,58(5):961-979. [20] Irene Ng,Glenn Parry,Laura Anne Smith,Roger S Maull.Transitioning from a goods-dominant to a service-dominant logic:Visualising the value proposition of rolls-royce [J].Journal of Service Management,2012,23(3):416-439. Title: Dai Yong (Business School, East China Normal University, Shanghai 200241, China)

基金

基于PBC的企业服务备件供应链优化决策研究,项目批准号:12CGL040。


PDF(1 KB)

Accesses

Citation

Detail

段落导航
相关文章

/